|
Goodyear Polymer Roof Replacement and Structural Steel Restoration |
|
![]() |
|
|
Scope: A complete roof tear-off and replaced with single ply membrane. The building has a steep, sloped, metal roof that will be replaced or recoated. Exposed structural steel is going to be cleaned, prepared and painted. Status: Inspections scheduled for roofing warranty. Construction start: 07/2006. Construction complete: 12/2006. Construction 100% complete. Punch-list and closeout in progress. Last update: 01/24/2007
|