<< Return to Regional History Collections

Judith Resnick Material


BOX #1

Folder 1A Entry

Pages of letters of the alphabet--"Chart pak Velvet Touch Lettering.

Folder 1B Resnick PDRS Correspondence

Memoranda of 1980, 1981, 1982. Among the subjects: SAIL Verification Testing for PDRS, STS-2; RPAT (The RMS Pre-Acceptance Test); SAIL Progress Report: GTS May 13 - June 20, 1980; RMS Level 6 Flight Software Verification, Release 18; RMS Delta Phase V Simulation; SAIL Progress Report: GTS April 13 - May 12, 1980; RMS Level 7 Software Verification Testing;

Folder 1C Resnick PDRS Correspondence

Memoranda 1981 and 1982 re. RMS (Remote Manipulator System) MDF

Folder 1D Radarsat

Memos of 12/10/82, 10/30/84, 4/24/85. Re. Radarsat.

Folder 1E ORST-1 PIX

Photos of a test to determine whether roller position and/or mast position effect

strength. Illustrations, diagrams.

Folder: Earth OBS

Materials of 1983, 1984, 1985 re. observations of Earth, meteorology, climatology, plate tectonics.

Folder: Female Urine Device

Memorandum of 10/5/84 re. Backup Urine Collection Devices.

Folder: DPS

Memorandum of 10/2/84 re. Stringing considerations for GPC Failures Prior to Entry; memorandum of 10/3/84 "Psychotic" GPC IOP Failures.

Folder 2A

Folder entitled COBE. Material re. Cosmic Background Explorer (COBE). Dated 1984.

Folder: RMS

Memorandum of 6/22/84 re. RMS Tip-off Rates.

Folder: Aborts/Dumps

Undated information re. abort contingencies.

Folder 2B

Folder entitled Potty. Illustrations and information on WCS (Waste Collection System) options.

Folder 2C

Folder entitled TSS Bids. Comments and questions re. TSS PIP-- Tethered Satellite System Payload Integration Plan.

Folder entitled Rendezvous. 1 page: "The De-mystification of Rendezvous".

Folder 2D IUS

CIU Uplink Techniques

TDRS-B Familiarization. 10/17/85.

IUS Seminar No.2--Airborne Support Equipment

Documents re. "Commanding" and "State Vectors"

IUS System Briefing--Airborne Support Equipment

IUS/TDRS P/L Communications

TDRS-B Crew Briefing

Spacecraft Subsystems

IUS Flight Director Console Data

Scheduled Events Table

Folder 3A

Information re. "entry".

Memorandum re. Manual Dakar Procedure

Contingency abort

Aborts

Flight Manual T-38A and AT-38B dated 6/1/82

Entry--Flight Control System Familiarization

E BFS BR 2101

Folder 3B

Entry Aero Briefing 2101

Materials re. aviation and weather

NASA Aircrew Annual Instrument Refresher Exam. March, 1985.

NASA Aircraft Operations Division. Proficiency Exam. T-38A. Aircraft.

Parts I and II.

Information re. entry maneuvers.

Folder 3C

Waste Collection System Workbook. WCS 2102A. 5/14/82.

Medical Equipment Workbook. Med EQ 2102. 3/1/83

Flight Procedures Handbook. January, 1983.

Inertial Measurement Unit Alignment.

Folder 3D

GNC Overviews Workbook. GNC OV 2102. 8/20/83.

Caution and Warning/Emergency Alarms Workbook. C&W 2102. 8/5/83.

Mechanical Systems Workbook. Mech Sys 2102. 9/15/83.

Folder 3E

Payload Assist Module-D (PAM-D). Flight Procedures Handbook. 1/27/84.

ET UMB DR 2102. External Tank. Umbilical Doors. 12/15/78.

ACT VENT 2102. Active Vent System Workbook. 3/2/81.

Folder 4A

Closed Circuit Television System Workbook. CCTV 2102A. 8/20/82.

Flight Training Instructions. Voice Communications.

Flight Training Instructions. Flight Information Publications (FLIP).

Folder 4B

T-38 Instrument Procedures. Undergraduate Pilot Training. Aug., 1977. ATC

Study Guide/Workbook P-V4A-A-IP-SW

ATC Manual 51-38. Advanced Flying, Jet. 1 September, 1977.

ATC Study Guide/Workbook. P-V 4A-A-SO-SW. Supplement 1. T-38 Systems Analysis Emergency Procedures. June, 1977.

Trainee Guide. Voice Communications. UI 32 01 01 01 FM. Basic SNFO. 1977.

Instrument Flying. AFM 51-37. 1 December, 1976.

Folder 4C

Instrument Flying, AFM 51-37. 15 August, 1979.

Information re. instrument flying.

Aircraft Operating Procedures. Vol. 1. T-38 A Aircraft. Flight Crew Operations

Directorate. Aircraft Operations Division. August, 1983.

Booklet, Jeppesen Professional CR Computer Instructions Handbook.

Advanced Flying, Jet. ATC Manual 51-38. 1 September 1984.

Folder: Force/Torque

Teleoperator Human Interface Technology. 1984 accomplishments.

Manual Control of Manipulator Forces and Torques Using Graphic Display.

Force-Torque Control Experiments with The Simulated Space Shuttle Manipulator in Manual Control Mode.

Memorandum of 20 August to GDL from Resnick. Subject: MDF Force-Torque Sensor Comments.

Folder: EVA

Handwritten notes concerning Force/Torque Sensor Notes. By GDLOW. Dated 3/24/85.

Dexterous Manipulation Demonstration (DMD) Project.

The Shuttle Remote Manipulator System and Its Potential Evolution.

Memorandum of 11/13/84 re. Force/Moment Sensor for Shuttle RMS.

RMS/FTS (Remote Manipulator System/Force Torque Sensor) Experiment Implementation Agreement.

Memorandum of 7/12/84. Subject: Phase II Force/Torque Display Evaluations and Control Experiments Conducted at JSC: Preliminary Analysis of Results.

STS Operations Programs Office Change Request asking to add DTO 0626 "Shuttle Remote Manipulator System Dexterous Manipulation Demonstration" to the FTSOD.

Memorandum of 3/30/83. Subject: Results of V1103/STS- 6 EMU Functional Checkout at KSC.

EMU (Extra-vehicular Mobility Unit) Familiarization

Fluid Systems

RMS Continued

EVA information. Annotated by Resnick. Dated 2/7/84.

Diagrams and information about Sunshields

Crew Procedure Change request re. the "integrated EVA Sunshield opening procedure."

Questions and Answers re. "EVA amd Prebreathes"

Document identified as EVC OPS 2144.

Folder: Tethered Sat.

Review Item Discrepancy. Initiated by Resnick. Re. Satellite Deployment Boom Motor control.

Document of 3/11/85: CB Comments on TSS Mission Operations Plan.

Martin Marrietta publication (photocopy) concerning a Tethered Satellite System-

-A Cooperative Project of the USA and Italy.

Folder: 1A

Communication/Instrumentation Workbook COM/IN 2102

Folder: 1B

Spinoff 1985

Photo of IUS (inertial upper stage)

Space Shuttle Mission 61-A Spacelab D-1. Press Kit. October, 1985.

Flight Data File. Centaur Deploy Checklist. STS 61 F,G October 15, 1985.

Contingency Traceability Matrix

Crew Medical Officer Handbook

Folder: 1C

Cargo Systems Manual: Spartan REM. Operations Division Payload and Operations Support Branch. May 17, 1985.

Avoid Verbal Orders Memorandum of 1/9/86.

Memorandum of 1/22/86. Revision of Flightcrew Schedule for STS 51-L Launch Countdown.

Memorandum of 1/22/86 from CB/SAIL Test Team. Subject: OI-7/51L Software Verification.

Food Network Newsletter

Cargo Systems Manual: Spartan-203/Halley. STS 51-L. Orbital Operations. Payload and Operations Support. Basic, PCN-1. January 8, 1986.

Folder: 1D

Space Shuttle Systems Handbook. Vol.1, Sections 1-11. September 13, 1985.

Folder: Orbital Landing Rollout.

Presentation (11/12/85). History, Hardware, Procedures.

Folder: Spartan

Handwritten memorandum from Resnick to Bob O, GDL. Dated 10/3/85. Subject: Space Stations Module Size Considerations.

Report of 1986 concerning Spartan Halley Mission--to observe the OV

spectrum of Comet Halley from Earth orbit in early 1986.

Report of 5/15/85 from the University of Colorado about Spartan/Halley Sunshield Safety Update and Review

Spartan/Halley Mission overview

Spartan/Halley Mission Summary. Agenda of Spartan-Halley/STS-51L Operations Review.

Spartan/Halley Launch Window Assessment

Spartan/Halley Mission Preliminary RAOJ APC Assignments

(Remote Adjustments)

Description of APSC Components

Cargo Systems Manual.

Spartan 101 STS 51G. May 30,

Flight Operations Support Annex. Spartan 203 UL. June, 1985.

Spartan/Halley Rendezvous Operations and Profile.

Spartan/Halley PDRS OPS. 5/20/85.

Spartan 203 Operations Criteria.

Spartan 203 Mission Operations Directorate. Dated 6/3/85.

Spartan 203 UL Operational Criteria.

Spartan Contingency EVA. 1/25/85.

Spartan/Halley Sunshade. University of Colorado L.A.S.P. All illustrations.

Other views of Spartan

Memorandum of 10/1/85. Subject: Minutes of the Second Spartan 203 Payload Operations Working Group Meeting.

Folder: Software

Memorandum of 12/14/84 from Ronald Grabe. Subject: 01-5 Software Deltas.

Folder: RMS

Handwritten memorandum by Resnick dated Jan.21, year? To: Irving Brown. Subject: What to Learn About PDRS/RMS To Be A Good Cape Crusader.

Space Shuttle Briefing. RMS MALF 2101. Title: RMS Malfunction.

Space Shuttle Briefing. ORB/RMS 1/F 2101. Title: Orbiter/RMS Interface.

Memorandum of 7/1/83. From Pramad Kumar. Subject: STS-7 Ghost Alarm "596 PDRS CNTL 2"

Memorandum of 1/3/84. Subject: Payload Issues Q and A, a Strawman.

Memorandum of 10/12/84. Subject: Weight Savings for Removal of the Remote Manipulator System from the Orbiter.

Systems Division Note of Interest of 10/22/84. Subject: RMS Command Check

Fail.

Memorandum of 11/9/84. Subject: Shuttle Remote Manipulator System Utilization Schedule.

Mechanical and RMS System Section. Quick Look Report. STS 41-G (OV-99). FOP 302. Launch date: October 5, 1984.

Memorandum of 1/4/85. Subject: RMS Single/Direct Drive Switch.

Review copy of data on nozzle operations.

PDRS Lesson Sequence Flow Chart

Memorandum of 1/24/85. Subject: Location of Grapple Fixture on EURECA

Memorandum of 2/27/85 concerning clearance length required for RMS Use.

PDRS Brief

Memorandum of 3/8/85. Subject: FDF Location of PDRS Procedures. Other memoranda attached concerning PDRS Procedures. Many are handwritten or annotated.

Memorandum of 5/20/85. Subject: RMS Removal (Revision 1 to MP [85-1] M022 dated 2/12/85.

Avoid Verbal Orders. Subject: Questions asked at SIMFAC.

Map of Toronto.

Folder: Safety

Memorandum of 6/10/83. Subject: Safe Distance for Firing of Liquid Propellant Engines.

Folder: RMS Systems

Computer instructions; diagrams; handwritten notes;

Document including diagrams of Payload Systems Operating Procedures for Spartan 203.

Folder: Space Station Assembly--Homan

Transcript to accompany a videotape about assembling a space station.

Folder: Stowage

Modular Locker Layout; 2 pages. Dated 4/20/84.

Lists of items of clothing, toiletries, pens, flashlights, etc. to wear and carry on for space flight. These items are Resnick's for flight 41-D.

Memo of 2/2/84 to all astronauts. From B.J. Dunbar. Subject: Crew Equipment Status: Optional Lists.

Lists of menus and food choices.

Information about stowage and locations for tools, clothing, food, cameras, etc.

Folder: TDRS

Document by Mark Childress. Dated 5/29/85. TDRS Overview.

Folder: Tethered Satellite/SES

1 page of 4 questions and answers, "Syncom Questions"

Memos and reports about the Tethered Satellite System. Includes: notes from a 10/31/83 Tethered Satellite Telecon.

Memo of 3/6/84. Subject: Tethered Satellite System (TSS)--Camera Assisted Docking.

Report of 3/18/84 by M.C. Contella entitled EH2 TSS Involvement.

Systems Engineering Simulator. Tethered Satellite Simulation (TSS) Requirements Definition. June, 1984. (2 copies)

1 page of 8/6/84. Comments on SES TSS Simulation Design Review.

68 pages. Apparently Program for a conference on the tethered satellite system--a cooperative project of the USA and Italy.

3 memoranda on letterhead of the Lockheed Engineering and Management Services Company, Inc. Containing minutes of meetings of September and October, 1984 about TSS.

2 pages about a Briefing of 9/26/84.

Diagram of Linear Serve Loop Model--Tether Control Mechanisms

Memo of 11/7/84. Subject: SES Satellite Control System Data.

Folder: Upper Stages

Memo of 3/7/85. Subject: Upper Stages. An overview. Tables showing Stage, Company, Weights, PL Weight, TOT Up Weight, PRPLTS; Notes.

Folder: 51-L TNG

Memos, reports, etc. of 1985. All concerning STS 51-L Includes:

Agenda dated 9/16/85

Flight Requirements Document STS 51-L. April, 1985.

Flight Requirements Document STS 51-L. Nov., 1985.

Description of changes to STS 51-L Flight Requirements Documents (2 versions)

Flight Crew Operations Directorate STS 51-L VITT Crew Briefing. Dated

11/20/85.

Memo of 10/18/85. Subject: Flight Director Assignments and Shift Schedule.

January 7, 1985 information for the astronaut pool. Task descriptions. 5 pages.

Three handwritten pages. "Middeck M 53 Activities"

Miscellaneous handwritten items about training assignments, data, target dates.

Document of 3/11/85. "Flight EVA Items"

Memo of 3/6/85. Subject: Software Should be Doing the Job

Planning Module. Lesson List Processor. Apparently concerning use of computerized training programs.

STS-51-L. Training Status Reports #1. Dated 5/8/85.

Systems Division Manning for STS-51-L as of 12/4/85.

Folder: IFM

Generally memos of 1983 and 1984 concerning "Inflight Maintenance Tasks." Illustrations, instructions and estimated time for repairing and/or replacing components. Memo of 3/22/84 is a STS-11 IFM Debriefing in which tasks performed were reported and evaluated. Includes suggestions for improvement.

Folder: Flight 41-D--Discovery

Diagrams of various views of the space ship. STS-14.

41-D Landing Opportunities Summary. 5/3/84.

Cargo Systems Manual: GAS Annex for STS 41-D. 5/5/84. Flight Data File.

FDF Manifest. STS 41-D Flight 4/30/84.

Flight Requirements Document.

6 photos

Descriptions of changes to STS 41-D (14) Flights

Requirements Document.

Flight Requirements Document STS 41-D (14). July, 1984.

Flight Requirements Document STS 41-D (14). August, 1984.

STS 41-D. National Space Transportation System Program Mission Report. September, 1984.

Memo of 12/17/84. Subject: LEASAT F2 Launch Vehicle Operations Summary regarding launching of Flight 41-D, which was successfully accomplished on 8/30/84 with Liftoff of Discovery.

Systems Anomalies--report of minor problems with Discovery.

Fairchild Republic Co. Waste Collection System Conceptual Study. Final Report. 2 versions. One of 12/11/84 and one of 1/18/85.

Improved Orbiter Waste Collection System Study. Final Report. 2 versions. (November and Nov.16, 1984) By McDonnell Douglas.

Waste Collection Subsystem Study by Hamilton Standard. Windsor Locks, CT. December, 1984.

Design Concept Definition Study for an Improved Shuttle Waste Collection Subsystem. General Electric. 11/30/84.

Box #3

Space Shuttle Systems Handbook--Vol. 1, Sections 1-11.

Space Shuttle Systems Handbook--Appendix

Crew Medical Officer Handbook

HP-41 Computer Handbook: Basic Flight Operations Directorate

Flight Procedures Handbook--January 23, 1985

Flight Procedures Handbook--May 31, 1984

Flight Procedures Handbook--June 15, 1984

Flight Procedures Handbook--February 16, 1988

Shuttle Flight Operations Manual, Vol. 2: Electrical Power Systems.

Environmental Control and Life Support Systems Workbook.

Flight Operations Contingency Plan

Orbital Maneuvering System Crew Training Manual.

Flight Procedures Handbook--November, 1980.

Payload Communication Workbook

K-Band Radar Workbook

Flight Procedures Handbook--November 7, 1983

Rendezvous/Proximity Operations Workbook

Space Shuttle Briefing: Stationkeeping/Separation

Folder: Spartan Safety Report

Auxiliary Power Unit Hydraulics/Water Spray Boiler Workbook

STS Operational Flight Rules Annex

STS Inertial Upper Stage (IUS) Systems Handbook

Empty Folders

Space Shuttle Systems Handbook--Vol. 1, Sections 1-11

Spin-off 1978

Spin-off 1977

Improved Waste Collection System Study. 11/01/84. Annotated and with a accompanying notes.

Waste Collection Subsystem Study (WCS). Presented by Hamilton Standard. 11/01/84.

(oversized) Engineering Layout of Shuttle Centaur/G. Illustrates the Fluid Systems.

Document about Rapid-Scanning Microspectropholometer (RMSP).

Space Technology in Remote Health Care.

Folder: Pam. Pam/Hughes 376. Questions and Amswers; Diagrams; Instructions about PAM--switches and timers.

Folder: Medical TNG--Crew Medical Officer Training Syllabus. 4 documents: Diagnostics, Therapeutics, Common Illnesses and Injuries--Diagnosis and Treatment, amd Drug Side Effects.

Road to Wings. 6/1/85. ATC Pamphlet 60-9. Reports on T-38 Class A Flight Mishaps between 1972 and April 1985. Reports whate happende, why and what lesson was learned.

NASA Facts. About SKYLAB missions of 1973 and 1974.

Payload/Cargo Integration Schedules/Planning Guidelines. Vol. 1, NASA and Commercial Payloads. Oct. 29, 1984.

Folder: OMV. OMV Requirements Assessment. Dated 12/10/84.

Folder: PCS. Summary of PCS changes for SPF 5 Style Implementation; IBM Publication: PCS Sequence Definition Computation/Integration. 11/13/84.

Communication/Instrumentation Workbook. COM/IN 2102, Feb., 1985.

Folder: Resnick 1A. Materials about the Mechanical Arm; document entitled Payload Deployment and Retrieval System for ASCANS. 1/4/85.

Folder: 1B. Annotated by Resnick and called "JR's Notes" about PDRS; Shuttle RMS; Mechanical Arm; PDRS Control Panel; Manipulator Controlled Interface Unit; End Effectors; RMS Software in GPC and much more. Transparencies.

Folder: Resnick 1C. RMS Design Description; PDRS System Operational Overview by Pramod Kumar 2/19/82. Payload Development and Retrieval System Overview.

Folder: Resnick 2A. 9 typewritten pages, "Training on Orbit Operations; Student Experiment (Float Zone Crystal Growth Experiment); GLOW experiment; PAM Developments.

Memorandum of 9/13/84 to "Zoo Crew". From M.L. Coats. Subject 41-D. Crew Report. heavily annotated by Resnick. Systems Anomaly List of 9/5/84.


9 pages of "memory joggers" by "M2". Annotated by Resnick for a debriefing.

STS 41-D (14) Postflight Debriefing Guide. Prepared by W.B.D. Jones. 8/23/84.

2 pages concerning Student Experiment Questions

5 pages. 41-D Problem Tracking List. 9/10/84.

JSC #20086. STS 41-D. National Space Transportation systems Program Mission Report of September, 1984.

STS 41-D. Crew Debriefing of 9/31/84. Annotated.

Catalog of Space Shuttle Earth Observations. Hand Held Photography. June, 1985.

STS 41-D Orbiter Quick Look Report

Several pages of notes--some handwritten; some typewritten--unidentified, but probably from debriefing sessions.

Folder: Payload--SSP. Memorandum of 5/18/84. Subject: Guidelines for Standard Switch Panel Usage, Layout, and Nomenclature.

2 packets of information about a Student Experiment, Chix in Space, sponsored by Kentucky Fried Chicken.

Space Transportation System Earth Observations Geological and Environmental Monitoring Sites Manual (2 copies)

Folder: Resnick 2C. Information about a Student Experiment sponsored by Buzzard Eng.; STS 41-D Orbiter Quick Look Report, by David Camp, 9/7/84; STS 41-D Technical Crew Debriefing, October, 1984; memo of 11/1/83--Crew Assignments for 41 E; STS 14 Key Personnel; STS 14 General Flight Requirements for Challenger Launch for June 4, 1984; LFC Payload General Arrangement--front view; Telesat STS-14, Revision B, January of 1984; Memorandum 3/9/84 to "Mimi", from Judy (Resnick), Subject: Revising CFES Activiation Time

Folder: Abort. ATO/AOA/TAL Training Manual of April, 1983; Space Shuttle Briefing. Ascent 5/17/84. Title: Ascent Abort Briefing; Ascent checklist; Regency Ascent Targeting Lesson: Solutions to Cases; 2 pages: OMS 1 and OMS 2 Targets; Flight Procedures Handbook: Proximity Operations, Preliminary, November 11, 1982; Handwritten notes by Resnick (1 page) about RMS Mission/Crew Operations; diagrams; transparencies

Folder of Transparencies


<< Return to Regional History Collections